Powering Innovation and Excellence in Electrical Projects
With years of expertise in the electrical industry, our team is committed to providing safe, efficient, and sustainable electrical systems for a wide range of projects.
PROJECT WE HAVE DONE
Maritan Hill Tank Farm Phase III 9-Tanks
Tank Light, Perimeter Light, Power Supply of Motor with motor controller
Client: Philippine Coastal Storage and Pipeline Corporation
Upgrading of MCC Bldg.
LR2 Rewiring and Upgrading of MCC Bldg. and Transformer Yard
Client: Philippine Coastal Storage and Pipeline Corporation
10 MVA 69-13.8KV Substation (Zameco II Project)
LIMA OUTLET (PHASE 1-A)
PROJECT REFERENCES
- Central Negros Electric Cooperative, Inc. (CENECO) Supply of Stanford Generator set 156.25KVA, 480/240Volts, 3Ph., 60Hz., 188Amps.
- Zambales Electric Cooperative II, Inc. (ZAMECO II) Supply two units of Siemens multifunction over current relay.
- Pampanga Electric Cooperative II, Inc. (PELCO II) Supply six pieces of SMU-20-200E Power Fuse.
- Cagayan Electric Cooperative II, Inc. (CAGELCO II) Supply six units of Lightning surge arrester, station class, duty cycle.
- Cagayan Electric Cooperative II, Inc. (CAGELCO II) Supply of fifty Assembly cut-out, 15KV 8KA with surge arrester 10KV.
- Teresa Crew Gold (Phils.) Inc. Supply of Power cables 1000M – 4C x 25MM², 1000M – 4C x 240MM², 1000M – 4C x 120MM².
- Danfoss Inc.Supply and installation of MCC, ATS and Switchgear for Maynilad Project
- Danfoss Inc. Supply Nema 3R Enclosure, Nema 12 Enclosure, MCCB, relays and accessories for Filinvest Project.
- Bacolod City Water District (BACIWA). Supply of Digital tester with capacitance and frequency test.
- Zambales Electric Cooperative II, Inc. (ZAMECO II). Supply, installation, testing and commissioning of two 10MVA power substation.
- Zambales Electric Cooperative II, Inc. (ZAMECO II). Repair and rehabilitation of one unit 5MVA substation transformer.
- Cepalco Energy Services and Trading Cooperative (CESTO). Supply of SF6 Circuit Breaker.
- Zambales Electric Cooperative II, Inc. (ZAMECO II). Construction of 13.2KV three-phase circuit.
- First Farmers Holding Corporation. Supply of labor, materials, tools, equipment and supervision for the installation of Air break switch and 78-span 69KV transmission line and substation equipment.
- Sparrow Hawk Construction. Construction of Modern slaughter house electrical and mechanical works.
- APEX Mining Company, Inc. Supply of XLPE Cables.
- Cepalco Energy Services and Trading Cooperative (CESTO). Supply of 20 pieces substation batteries.
- San Carlos Bio-Energy. Supply of 300M royal cord.
- Zambales Electric Cooperative II, Inc. (ZAMECO II). Installation and mounting of equipment and electric structures and construction of civil works.
- The Enterprise Building. Dismantling of old power transformer and installation of new 2.5MVA power transformer.
- Armed Forces and Police Mutual Benefit Association, Inc. Supply and Installation of Discharge Duct.
- ASIAPHIL Manufacturing Industries, Inc. Installation of electrical equipment and structure, construction of equipment foundation, control house, perimeter fence including civil works.
- Marinduque Electric Cooperative, Inc. (MARELCO). Supply, installation, testing and commissioning of 5MVA, 69/13.2KV substation.
- Quezon Electric Cooperative II, Inc. (QUEZELCO II). Supply, installation, testing and commissioning of 5MVA, 69/13.2KV substation.
- Cagayan Electric Cooperative I, Inc. (CAGELCO I) Supply, installation, testing and commissioning of 15/18.75MVA, 69/13.2V substation.
- Zambales Electric Cooperative II, Inc. (ZAMECO II) Rehabilitation of 5MVA, 69/13.2KV substation.
- Zambales Electric Cooperative II, Inc. (ZAMECO II) Supply, installation, testing and commissioning of 5MVA, 69/13.8KV substation.
- Zambales Electric Cooperative II, Inc. (ZAMECO II) Supply, installation, testing and commissioning of 10MVA, 69/13.8KV substation.
- Cagayan Electric Cooperative II, Inc. (CAGELCO II) Rehabilitation of 5MVA substation.
- Central Negros Electric Cooperative (CENECO) Supply, installation, testing and commissioning of 30MVA, 69/13.2KV substation.
- METAPHIL Inc. Design and Planning of Process flow, piping and instrumentation.
- San Carlos Bio-Energy Supply of 30KVA Powerex AVR.
- Edell Enterprises Supply of two unit of Shot gun stick.
- Armed Forces and Police Mutual Benefit Association, Inc. Preventive maintenance of electrical system.
- Steel Asia Manufacturing Corporation Supply and installation of Power cable and cable tray for Davao Mill Project.
- MB Century Drilling and Energy Services (NZ) Ltd. c/o SN Aboitiz Power-Magat, Inc. Preparation of Plans, drawings and documentations including signed and sealed of permits for MARIIS Optimization Project Weir Upgrade, Ramon, Isabela.
- Armed Forces and Police Mutual Benefit Association, Inc. Repairing of Generator set.
- Zambales Electric Cooperative II, Inc. (ZAMECO II) Preventive maintenance of 10MVA 69/13.8KV substation.
- MB Century Drilling and Energy Services (NZ) Ltd. c/o SN Aboitiz Power-Magat, Inc. Supply of labor, materials, tools, equipment and supervision for the fabrication of workshop trolley for MARIIS Optimization Project Weir Upgrade, Ramon, Isabela.
- MB Century Drilling and Energy Services (NZ) Ltd. c/o SN Aboitiz Power-Magat, Inc. Supply and fabrication of Spacers, shims and washers for MARIIS Optimization Project Weir Upgrade, Ramon, Isabela.
- MB Century Drilling and Energy Services (NZ) Ltd. c/o SN Aboitiz Power-Magat, Inc. Supply of Conveyor rubberize belt 200MM x 40M, 3PLY for MARIIS Optimization Project Weir Upgrade, Ramon, Isabela.
- Unilever Philippines. Preventive maintenance and Oil leak correction of distribution transformer banks 3×50 + 3x100KVA.
- Unilever Philippines. Preventive maintenance and Oil leak correction of 2x1000KVA power transformer.
- Philippine Resins Industries Inc. Supply and fabrication of steel door.
- Laguna Water c/o Controtek Solution. Cable layout, conduiting and piping cable works at Booster pump house No. 1,2 and 3 including SCADA Works for Laguna Water Project, Ayala Greenfield Estate Calamba, Laguna.
- ABB Philippines Inc. / JG Summit. Supply of materials and manpower for fabrication of 8x MVSG Skid. at Brgy. Simlong, Batangas.
- Rhinotech / Air Liquide Phils Inc. Gas handling supervision and Gas quality checking of 1x DT1-145FK F1, GE DTCB, 115KV at LISP 2, Batino, Calamba Laguna.
- Schneider Electric / MERALCO. Installation, testing and commissioning of 8x WS GIS & Skid fabrication, 34.5KV gas insulated switchgear at Grace Park S/S, Caloocan City.
- CLECC – Wartsila / UPSI. Installation, testing and commissioning of 1x 50MVA, 69/13.8KV Air insulated substation at BCCPP – Limay, Bataan.
- CLECC – Wartsila / UPSI. Installation, testing and commissioning of 1x 25MVA, 69/13.8KV Air insulated substation at BESS S/S – Toledo, Cebu.
- Schneider Electric / MERALCO. Installation, testing and commissioning of 9x CBGS-0 GIS & Skid fabrication, 34.5KV Gas insulated switchgear at Sta. Rosa II S/S – Laguna.
- Schneider Electric / MERALCO. Installation, testing and commissioning of 9x CBGS-0 GIS & Skid fabrication, 34.5KV Gas insulated switchgear at Cainta S/S – Cainta, Rizal.
- GE / SNPDRI / NGCP. Installation, erection, gas handling and primary testing of 9x B105-6 GIS, 230KV at Navotas, Manila S/S.
- Siemens Energy Inc. / UPSI. Relay configuration, fiber optic splicing, testing, commissioning and various wiring modification work of 2x 25MVA, 69/13.8KV Air insulated substation protn. at BESS S/S – Magapit, Cagayan.
- Siemens Energy Inc. / UPSI. Relay configuration, fiber optic splicing, testing, commissioning and MVSG bus-barring works of 2x 25MVA, 69/13.8KV Air insulated substation protn. at BESS S/S – Gamu, Isabela.
- Siemens Energy Inc. / UPSI. Relay configuration, fiber optic splicing, testing, commissioning and various wiring modification work of 2x 25MVA, 69/13.8KV Air insulated substation protn. at BESS S/S – Conception, Tarlac.
- RJIR – Wartsila / UPSI. Installation, testing and commissioning of 2x 25MVA, 69/13.8KV Air insulated substation at BESS S/S – Ormoc, Leyte.
- Siemens Energy Inc. / UPSI. Cable pulling, termination, testing and commissioning of 50MW, 69/13.8KV Air insulated substation at BESS S/S – Mexico, Pampanga.
- Siemens Energy Inc. / UPSI. Cable pulling, termination, testing and commissioning of 3x 25MVA, 69/13.8KV Air insulated substation at BESS S/S – San Manuel, Pangasinan.
- Siemens Energy Inc. / UPSI. Cable pulling, termination, testing and commissioning of 50MW, 69/13.8KV Air insulated substation at BESS S/S – Lumban, Laguna.
- Schneider Electric / MERALCO. Installation, testing and commissioning of 9x CBGS-0 GIS & Skid fabrication, 34.5KV Gas insulated switchgear at LISP 1 S/S – Cabuyao, Laguna.
- Schneider Electric / MERALCO. Installation, testing and commissioning of 9x WS GIS & Skid fabrication, 34.5KV Gas insulated switchgear at Island Cove S/S – Kawit, Cavite.
- NGCP. Construction of Metering equipment foundation for QUEZELCO I – GumacaAtimonan 69KV at Gumaca S/S – Gumaca Quezon.
- NGCP. Construction of Concrete foundation for Metering equipment of ISELCO I – Cauayan 69KV Totalizer at Cauayan S/s – Cauayan, Isabela.
- Daikin South Luzon Office. Testing for Electrical System of Daikin Philippines South Luzon Office and Training Hub at Silang, Cavite.
- First Gen / MCD. Supply of Labor and Test equipment for testing of electrical equipment for Batangas FGLNG at Batangas City.
- RJIR – Wartsila / UPSI. Testing and Commissioning of 10MW BESS Integrated renewable powerhub at BESS S/S – Tagum, Davao.
- Prime Metro BMD Corporation. Supply and delivery of Power cables LiOA Brand, Cu/XLPE/PVC/SWA/Fr-PVC, 0.6/1(1.2KV), IEC 60502-1 Standard & Cu/XLPE/Fr-PVC, 0.6/1(1.2KV), IEC 60502-1 Standard for Prime BMD Project Site, Upper Wawa Pumping Station, Purok 6, Sitio Paikulan, Brgy. Calawis, Antipolo City – Year 2022.
- Petron Bataan Refinery. Supply and delivery of High voltage electrical equipment for BP04-0016 and Installation of 230KV substation for Petron Bataan Refinery Project – Year 2002 – 2003.
- Petron Bataan Refinery. Supply and installation of Distribution lines 69KV for Petron Bataan Refinery Project –Year 2003 – 2005.
- INGASCO Inc. Supply of 1110M medium voltage cable 8.7/15 (17.5KV), IEC 60502 and 1C x 500MM² Cu/XLPE/CTS/PVC – Year 2007.
- INGASCO Inc. Supply of Magnetic XLPE Cable – Year 2007.
- Philippine Coastal Storage and Pipeline Corporation (PCSPC) Supply and delivery of 1MVA pad mounted transformer – Year 2013.
- Philippine Coastal Storage and Pipeline Corporation (PCSPC) Design and construction of Maritan Hill Tank Farm and its related facilities Phase 1 – Year 2013 – 2014.
- Philippine Coastal Storage and Pipeline Corporation (PCSPC) Supply and delivery of 1MVA pad mounted transformer – Year 2016.
- Philippine Coastal Storage and Pipeline Corporation (PCSPC) Design and construction of Maritan Hill Tank Farm and its related facilities Phase 2 –Year 2016 – 2017.
- Philippine Coastal Storage and Pipeline Corporation (PCSPC). Supply and installation of 100HP motor pump cabling and retrofitting of MCC Panel and Extension of 5HP motor cabling at LR2, Boton Hill Tank Farm – Year 2018.
- Philippine Coastal Storage and Pipeline Corporation (PCSPC) Repairing of TTLR at Boton Hill Tank Farm – Year 2018.
- Philippine Coastal Storage and Pipeline Corporation (PCSPC). Rewiring and upgrading of LR2 MCC Building and Transformer yard at Boton Hill Tank Farm –Year 2018 – 2019.
- Philippine Coastal Storage and Pipeline Corporation (PCSPC) (ADENDUM) Rewiring and upgrading of LR2 MCC Building and Transformer yard at Boton Hill Tank Farm – Year 2019.
- Philippine Coastal Storage and Pipeline Corporation (PCSPC) Supply of labor, materials, tools, equipment and Technical know-how for the thermal scanning of Electrical equipment, Motor Controls and Pumps at LR2, Boton Hill Tank Farm – Year 2019.
- Conception Durables, Inc. As-Built Works and Studies for Plant power system at LISP 1 Cabuyao, Calamba Laguna – Year 2019.
- Philippine Coastal Storage and Pipeline Corporation (PCSPC) Supply, delivery and oil filling of new transformer insulating oi at LR2, Boton Hill Tank Farm –Year 2019.
- V&A Law Firm Center Building Modification and Site Servicing of Automatic transfer switch and control at BGC, Taguig City –Year 2019.
- Philippine Coastal Storage and Pipeline Corporation (PCSPC) Design and construction of Maritan Hill Tank Farm and its related facilities Phase 3 – Year 2019 – 2020.
- Philippine Coastal Storage and Pipeline Corporation (PCSPC) (ADENDUM) Design and construction of Maritan Hill Tank Farm and its related facilities Phase 3 –Year 2019 – 2020.
- Trends / Sem-Calaca Power Corp. Supply, installation, testing and commissioning of 6x 460V, 3P LV Panel, ATS and SDP’s at Unit 1&2 P/P – Calaca, Batangas – Year 2020.
- Philippine Coastal Storage and Pipeline Corporation (PCSPC) Preventive Maintenance of 1500KVA and 2000KVA Power Transformer at Boton Hill Tank Farm –Year 2021.
- Pepsi Cola Products Philippines, Inc. (PCPPI) Supply and installation of 25M³ LCO2 VIE Tanks at PCPPI – Tunasan, Muntinlupa – Year 2021.
- Philippine Coastal Storage and Pipeline Corporation (PCSPC) Supply of labor, materials, tools, equipment and consumables to perform PMS and Testing of Pad Mounted Transformer, MVSG and Load Break Switch at Maritan Hill Tank Farm – Year 2022.
- Pepsi Cola Products Philippines, Inc. (PCPPI) Supply and installation of 25M³ LCO2 VIE Tanks at PCPPI – Naga City –Year 2022.
- Philippine Coastal Storage and Pipeline Corporation (PCSPC) Supply and installation of 2x 7.5HP, 20HP, 25HP, 30HP and 40HP Motor Power Supply for Trafigura Project located at Boton Hill Tank Farm – Year 2022.
- Philippine Coastal Storage and Pipeline Corporation (PCSPC) Construction of additional MCC Building, Transformer Yard and Supply and Installation of Motors for RON-88 Project located at LR2 Boton Hill Tanks Farm – Year 2022.
- Schneider Electric / ePLDT Hauling, unloading, lifting, positioning and anchoring of 4 units of 1MVA LV Dry type Transformer at Vitro Datacenter – Bagong Ilog, Pasig – Year 2022 – 2023.
- Daikin Philippines Testing of Electrical system of Daikin Head Quarters and Training Hub at Daikin Libis, Quezon City – Year 2023.
- Pepsi Cola Products Philippines, Inc. (PCPPI) Supply and installation of 25M³ LCO2 VIE Tanks at PCPPI – Rosario, La Union – Year 2023.
- Philippine Coastal Storage and Pipeline Corporation (PCSPC) Preventive Maintenance of 1000KVA Power Transformer at LR2 Boton Hill Tank Farm – Year 2023.
- Metalite Builders Development Co., Inc. Supply and Installation of Temporary Supply for Temporary Facilities at Maritan Tank Farm, PCSPC, SBFZ – Year 2024
- Philippine Coastal Storage and Pipeline Corporation (PCSPC) Supply, Installation, Testing and Commissioning of Accuload System including Power Cables, Soft Starters, MCC Panels, Cable Glands and Conduit for 7.5HP Pump Motor for CME Project at Boton Tank Farm, PCSPC, SBFC – Year 2024
- Global-Estate Resorts, Inc. Supply and delivery of 100kva Step Down Dry Type Transformer – Completion date: December 17, 2024
- Prime Metro BMD Corporation Supply and Delivery of Various Electrical Materials Completion date: December 19, 2024
- Agility Beyond Space (ABS) / Broadband Broadcast Services (BBS) Supply and installation of Automatic Transfer Switch ATS(2500A) Completion Date: Aug 9, 2024.
- 3GEE Systems Solution Corp. Supply and Delivery of 2 units of 80kva Step Down Dry Type Transformer Completion Date: January 10, 2025.